Tamar station
This article needs additional citations for verification. (March 2007) |
Tamar 添馬 | ||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Proposed MTR rapid transit station | ||||||||||||||||||||
Chinese name | ||||||||||||||||||||
Traditional Chinese | 添馬 | |||||||||||||||||||
Simplified Chinese | 添马 | |||||||||||||||||||
| ||||||||||||||||||||
General information | ||||||||||||||||||||
Location | Lung Wo Road × Tim Wa Avenue, Admiralty Central and Western District, Hong Kong | |||||||||||||||||||
Coordinates | 22°16′55″N 114°09′58″E / 22.2820°N 114.1660°E | |||||||||||||||||||
Owned by | MTR Corporation | |||||||||||||||||||
Operated by | MTR Corporation | |||||||||||||||||||
Line(s) |
| |||||||||||||||||||
Platforms | 4 (2 island platforms) | |||||||||||||||||||
Tracks | 4 | |||||||||||||||||||
Construction | ||||||||||||||||||||
Structure type | Underground | |||||||||||||||||||
Platform levels | 3 | |||||||||||||||||||
Other information | ||||||||||||||||||||
Station code | TAM | |||||||||||||||||||
Services | ||||||||||||||||||||
| ||||||||||||||||||||
|
Tamar (Chinese: 添馬) is a station on MTR's shelved North Island line (NIL) proposal on the north shore of Hong Kong Island. It will be located on the former site of HMS Tamar on Hong Kong Island, Hong Kong. Tamar station will be the eastern terminus of the Tung Chung line and the western terminus of the Tseung Kwan O line. It will also act as a transfer station between the two lines.
According to a 2014 study, it was suggested to start construction of the station in 2021 and open it in 2026.[1] Geographically, the ‹See TfM›Admiralty MTR station is located to the south, while Tamar Park is located to the north. The station would sit at the foot of the Central Government Complex, directly under Tamar Park.
History
[edit]In 2006, the Hong Kong Government was set to implement the Tamar Development Project.[2] The new Government Complex was inaugurated in 2011,[3] but the timetable of the construction of the NIL station was still undecided.
On 21 February 2013, the Highways Department published an improved version of the "Railway Development Strategy." As part of the second phase of public consultation for the North Island line, the department created two proposals: a "swap" scheme and an "interchange" scheme.[4] In the former plan, the North Island line would be split in two lines. The Tung Chung line would extend east from Hong Kong station to serve the new Tamar, ‹See TfM›Exhibition Centre, and ‹See TfM›Causeway Bay North stations before using the current Island line track from ‹See TfM›Fortress Hill to ‹See TfM›Chai Wan.
Meanwhile, the Tseung Kwan O line would extend west past North Point station to the Island line's ‹See TfM›Tin Hau station before going along the current Island line to the Kennedy Town station.[4] In the latter, the Tung Chung line would be extended one stop, from Hong Kong to Tamar, while the Tseung Kwan O line would be extended three stops, from North Point to Causeway Bay North, Exhibition, and Tamar (with Tamar becoming an interchange station and terminal for the two lines).[4]
The Hong Kong government opted for the "interchange" scheme in 2014, which meant that the Tamar station would be a four-track, two-level station, as opposed to the two-track, one-level station proposed as part of the "swap" scheme.[1]
References
[edit]- ^ a b "Railway Development Strategy 2014" (PDF). Transport and Housing Bureau. September 2014. Archived from the original (PDF) on 29 June 2018. Retrieved 2 November 2016.
- ^ "TAMAR DEVELOPMENT PROJECT Executive Summary" (PDF). aud.gov.hk. Retrieved 2 November 2016.
- ^ "HKSAR Government Headquarters / Rocco Design Architects". ArchDaily. 28 February 2014. Retrieved 2 November 2016.
- ^ a b c "Environmental Report 2013" (PDF). epd.gov.hk. Hong Kong Highways Department. 21 February 2013. Retrieved 2 November 2016.